Triple

T38461897
Position Surface form Disambiguated ID Type / Status
Subject Cabinet Committee on Legislative Cases E912472 entity
Predicate processStepBefore P102946 FINISHED
Object Consideration by Federal Cabinet of Pakistan LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Consideration by Federal Cabinet of Pakistan | Statement: [Cabinet Committee on Legislative Cases, processStepBefore, Consideration by Federal Cabinet of Pakistan]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: processStepBefore
Context triple: [Cabinet Committee on Legislative Cases, processStepBefore, Consideration by Federal Cabinet of Pakistan]
  • A. preparedBefore
    Indicates that one entity was prepared or made ready at an earlier time than another entity.
  • B. controlledBefore
    Indicates that one entity had control or authority over another entity during a time period that occurred earlier than a specified reference time or event.
  • C. previousStage
    Indicates that one stage occurs immediately before another in an ordered sequence of stages.
  • D. invokedBefore
    Indicates that one event, action, or process is initiated or executed earlier in time than another specified event, action, or process.
  • E. predecessorProcess chosen
    Indicates that one process occurs or is executed before another process in a defined sequence or workflow.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e861d8c81908559031dc66e3c15 completed May 3, 2026, 3:49 p.m.
NER Named-entity recognition batch_69fcce7afcd08190906cc3801152656a completed May 7, 2026, 5:40 p.m.
PD Predicate disambiguation batch_69fcccf140ec8190862d53388a5f40d7 completed May 7, 2026, 5:33 p.m.
Created at: May 3, 2026, 4:31 p.m.