Triple
T38420595
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Dallas–Fort Worth metroplex burial grounds |
E903216
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | regional burial infrastructure |
C1534
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: regional burial infrastructure Context triple: [Dallas–Fort Worth metroplex burial grounds, instanceOf, regional burial infrastructure]
-
A.
funerary site
A funerary site is a designated place where human or animal remains are buried, entombed, or otherwise ritually deposited, often accompanied by structures, markers, or artifacts related to death and commemoration.
-
B.
burial place
chosen
A burial place is a designated location where human or animal remains are interred, such as a grave, tomb, cemetery, or mausoleum.
-
C.
historic communal burial structure
A historic communal burial structure is an enduring, often monumental edifice or site designed to inter and memorialize the dead of a community or group across generations.
-
D.
memorial facility
A memorial facility is a dedicated place designed to honor, remember, and commemorate individuals or events through monuments, services, and preserved spaces.
-
E.
burial subject
A burial subject is an individual or entity that is the primary focus of a burial, interment, or related funerary practice.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e67e4fc8190a7d08dfe9a8af998 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:31 p.m.