Triple

T38404527
Position Surface form Disambiguated ID Type / Status
Subject Novokramatorsky Mashinostroitelny Zavod E900987 entity
Predicate instanceOf P0 FINISHED
Object heavy engineering plant C4731 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: heavy engineering plant
Context triple: [Novokramatorsky Mashinostroitelny Zavod, instanceOf, heavy engineering plant]
  • A. industrial plant
    An industrial plant is a large-scale facility where raw materials are transformed through mechanical, chemical, or biological processes into finished or semi-finished products using specialized equipment and coordinated operations.
  • B. manufacturing plant chosen
    A manufacturing plant is a large-scale industrial facility where raw materials are transformed through organized processes, machinery, and labor into finished goods or components.
  • C. heavy equipment manufacturer
    A heavy equipment manufacturer is a company that designs, engineers, and produces large-scale machinery and vehicles used in construction, mining, agriculture, and other industrial applications.
  • D. integrated steel mill
    An integrated steel mill is a large industrial complex that converts raw materials like iron ore, coal, and limestone into finished steel products through a continuous, vertically integrated process including coke making, ironmaking, steelmaking, and rolling.
  • E. heavy conversion unit
    A heavy conversion unit is an industrial processing system designed to transform dense, low-value feedstocks into lighter, higher-value products through high-severity thermal and/or catalytic operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6071a081909eea7a670d21420c completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:31 p.m.