Triple
T38399548
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Portlaoise railway station |
E900857
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Irish Rail station |
C65174
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Irish Rail station Context triple: [Portlaoise railway station, instanceOf, Irish Rail station]
-
A.
Carmelit station
Carmelit station is a transit facility serving as one of the underground stops along the Carmelit funicular railway system.
-
B.
Tri-Rail station
A Tri-Rail station is a designated passenger rail facility along South Florida’s Tri-Rail commuter line where trains stop to allow riders to board, alight, and access related transit services.
-
C.
Merseyrail station
A Merseyrail station is a railway facility served by the Merseyrail network, providing passenger access, ticketing, and related services on its urban and suburban routes in the Liverpool City Region.
-
D.
Thomson–East Coast Line station
A Thomson–East Coast Line station is a rapid transit facility on Singapore’s Thomson–East Coast MRT line that serves as a passenger access point for boarding, alighting, and transferring between trains and other transport modes.
-
E.
Trinity Railway Express station
A Trinity Railway Express station is a designated passenger rail facility along the Trinity Railway Express commuter line that provides platforms, ticketing access, and related services for boarding and alighting trains.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6071a081909eea7a670d21420c |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:31 p.m.