Triple
T38396232
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tryweryn reservoir scheme |
E900770
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | controversial public works scheme |
C2938
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: controversial public works scheme Context triple: [Tryweryn reservoir scheme, instanceOf, controversial public works scheme]
-
A.
infrastructure project
chosen
An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
-
B.
controversial monument
A controversial monument is a public structure or statue whose symbolism, subject, or historical associations provoke significant debate, disagreement, or social tension within a community.
-
C.
Athenian public works program
Athenian public works program: A state-sponsored initiative in classical Athens that funded large-scale construction, infrastructure, and artistic projects—often employing citizens and metics—to enhance civic life, display communal wealth and power, and provide economic support.
-
D.
public utility undertaking
A public utility undertaking is an organization, typically owned or regulated by the state, that provides essential services such as water, electricity, gas, or public transportation to the public on a large-scale, ongoing basis.
-
E.
government-backed scheme
A government-backed scheme is a program or initiative supported, funded, or guaranteed by a governmental authority to achieve specific public policy objectives, such as economic stability, social welfare, or infrastructure development.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6071a081909eea7a670d21420c |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:31 p.m.