Triple

T38396232
Position Surface form Disambiguated ID Type / Status
Subject Tryweryn reservoir scheme E900770 entity
Predicate instanceOf P0 FINISHED
Object controversial public works scheme C2938 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: controversial public works scheme
Context triple: [Tryweryn reservoir scheme, instanceOf, controversial public works scheme]
  • A. infrastructure project chosen
    An infrastructure project is a large-scale, organized effort to plan, design, and construct foundational physical systems—such as transportation, utilities, and public facilities—that support a community’s or region’s economic and social activities.
  • B. controversial monument
    A controversial monument is a public structure or statue whose symbolism, subject, or historical associations provoke significant debate, disagreement, or social tension within a community.
  • C. Athenian public works program
    Athenian public works program: A state-sponsored initiative in classical Athens that funded large-scale construction, infrastructure, and artistic projects—often employing citizens and metics—to enhance civic life, display communal wealth and power, and provide economic support.
  • D. public utility undertaking
    A public utility undertaking is an organization, typically owned or regulated by the state, that provides essential services such as water, electricity, gas, or public transportation to the public on a large-scale, ongoing basis.
  • E. government-backed scheme
    A government-backed scheme is a program or initiative supported, funded, or guaranteed by a governmental authority to achieve specific public policy objectives, such as economic stability, social welfare, or infrastructure development.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6071a081909eea7a670d21420c completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:31 p.m.