Triple

T38396230
Position Surface form Disambiguated ID Type / Status
Subject Tryweryn reservoir scheme E900770 entity
Predicate instanceOf P0 FINISHED
Object reservoir construction project C13691 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: reservoir construction project
Context triple: [Tryweryn reservoir scheme, instanceOf, reservoir construction project]
  • A. reservoir dam chosen
    A reservoir dam is a large engineered barrier built across a watercourse to store and regulate water in an upstream reservoir for purposes such as water supply, flood control, irrigation, and power generation.
  • B. proposed dam project
    A proposed dam project is a planned infrastructure initiative to construct a barrier across a waterway for purposes such as water storage, flood control, energy generation, or irrigation, pending approval and implementation.
  • C. water reservoir complex
    A water reservoir complex is an integrated system of interconnected reservoirs, infrastructure, and control facilities designed to store, manage, and distribute water for purposes such as supply, irrigation, flood control, and power generation.
  • D. dam expansion project
    A dam expansion project is a large-scale infrastructure initiative to increase an existing dam’s capacity, performance, or functionality—typically to enhance water storage, energy generation, or flood control—through structural modifications and associated environmental and social mitigation measures.
  • E. reclamation project
    A reclamation project is an organized effort to restore, rehabilitate, or repurpose disturbed or degraded land, water, or resources for productive or environmentally sustainable use.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e6071a081909eea7a670d21420c completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:31 p.m.