Triple
T38396144
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Tagum City Airport |
E900768
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | planned airport |
C44526
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: planned airport Context triple: [Tagum City Airport, instanceOf, planned airport]
-
A.
aviation infrastructure plan
An aviation infrastructure plan is a strategic blueprint that outlines the development, expansion, maintenance, and integration of airport facilities, airspace systems, and supporting services to safely and efficiently meet current and future air transportation needs.
-
B.
planned city
A planned city is an urban area whose layout, infrastructure, and land use are deliberately designed and constructed according to a comprehensive plan before significant settlement occurs.
-
C.
airport infrastructure project
chosen
An airport infrastructure project is a coordinated set of planning, design, construction, and upgrade activities aimed at developing or improving airport facilities, systems, and services to support safe, efficient air transportation.
-
D.
public airport
A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
-
E.
planned development
A planned development is a real estate project in which land use, building placement, density, and amenities are comprehensively designed and approved as a unified, coordinated plan rather than as individual, piecemeal developments.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e6071a081909eea7a670d21420c |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:31 p.m.