Triple
T38382962
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Cut Hands |
E893802
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | percussion-driven project |
C36214
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: percussion-driven project Context triple: [Cut Hands, instanceOf, percussion-driven project]
-
A.
percussion album
A percussion album is a collection of recorded musical pieces that primarily feature percussion instruments, emphasizing rhythm, texture, and percussive soundscapes.
-
B.
avant-garde music project
chosen
An avant-garde music project is an experimental artistic endeavor that challenges conventional musical structures and aesthetics through innovative sounds, techniques, and interdisciplinary concepts.
-
C.
solo percussion work
A solo percussion work is a musical composition written for a single percussionist, often exploring a wide range of timbres, techniques, and rhythmic complexity using one or multiple percussion instruments.
-
D.
percussion instrument
A percussion instrument is a musical device that produces sound when struck, shaken, or scraped, often providing rhythm, accents, and texture in musical compositions.
-
E.
progressive music project
A progressive music project is an evolving, concept-driven musical endeavor that experiments with complex structures, diverse influences, and innovative sound design to push beyond conventional genre boundaries.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e4b1f748190a380696a16eae4a2 |
completed | May 3, 2026, 3:48 p.m. |
Created at: May 3, 2026, 4:31 p.m.