Triple
T3838020
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | River Scout |
E91182
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | freshwater exhibit |
C14504
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: freshwater exhibit Context triple: [River Scout, instanceOf, freshwater exhibit]
-
A.
aquatic show
An aquatic show is a live performance featuring trained marine animals, synchronized swimming, water-based stunts, and visual effects presented in or around a pool or aquatic environment.
-
B.
public aquarium
A public aquarium is a facility that displays live aquatic animals and plants in tanks and exhibits for education, conservation, and recreation.
-
C.
oceanarium
An oceanarium is a large marine facility that houses and displays diverse ocean life in expansive, often open-ocean–simulating tanks for education, research, and public viewing.
-
D.
indoor aquarium
An indoor aquarium is a controlled, enclosed environment within a building designed to house and display aquatic life in water-filled tanks for observation, education, and enjoyment.
-
E.
freshwater lake
A freshwater lake is a naturally occurring inland body of standing water with low salt concentration, supporting diverse aquatic ecosystems and often serving as a critical resource for wildlife and human use.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed960b538819096561c8ed448dec9 |
completed | March 9, 2026, 2:29 p.m. |
Created at: March 9, 2026, 3:18 p.m.