Triple

T38379908
Position Surface form Disambiguated ID Type / Status
Subject French Air and Space Force underground command center (base 921) in Montmorency forest E893726 entity
Predicate instanceOf P0 FINISHED
Object hardened command-and-control bunker C32756 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: hardened command-and-control bunker
Context triple: [French Air and Space Force underground command center (base 921) in Montmorency forest, instanceOf, hardened command-and-control bunker]
  • A. nuclear bunker
    A nuclear bunker is a heavily reinforced underground shelter designed to protect occupants and critical equipment from nuclear blasts, radiation, and other catastrophic threats.
  • B. command-and-control facility chosen
    A command-and-control facility is a secure, centralized location equipped with communication, monitoring, and decision-support systems used to direct and coordinate operations and resources in real time.
  • C. U-boat bunker
    A U-boat bunker is a heavily fortified, often bomb-resistant naval facility designed to shelter, maintain, and deploy submarines, particularly German U-boats during World War II.
  • D. Enclave facility
    An Enclave facility is a secure, self-contained installation designed to isolate, protect, and control sensitive operations, resources, or populations from external access or influence.
  • E. Red Army command position
    A Red Army command position is an organizational role within the Soviet military hierarchy responsible for planning, directing, and controlling the operations and administration of assigned units or formations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e4b1f748190a380696a16eae4a2 completed May 3, 2026, 3:48 p.m.
Created at: May 3, 2026, 4:31 p.m.