Triple

T3837971
Position Surface form Disambiguated ID Type / Status
Subject UPS Worldwide Express E91181 entity
Predicate instanceOf P0 FINISHED
Object international shipping service C4440 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: international shipping service
Context triple: [UPS Worldwide Express, instanceOf, international shipping service]
  • A. shipping service chosen
    A shipping service is a business or system that transports goods from one location to another, managing logistics such as packaging, routing, tracking, and delivery.
  • B. domestic shipping service
    A domestic shipping service is a business or system that transports packages and goods between locations within the same country, offering various delivery speeds, tracking, and handling options.
  • C. international port
    An international port is a major maritime facility equipped to handle the arrival, departure, and transfer of cargo and passengers between countries, integrating customs, logistics, and transportation infrastructure.
  • D. international office
    An international office is an organizational unit that manages and supports an institution’s global activities, partnerships, and services for international stakeholders.
  • E. shipping route
    A shipping route is a predefined path or corridor used by vessels or carriers to transport goods between specific origins and destinations, often optimized for safety, cost, and transit time.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed960b538819096561c8ed448dec9 completed March 9, 2026, 2:29 p.m.
Created at: March 9, 2026, 3:18 p.m.