Triple

T3835947
Position Surface form Disambiguated ID Type / Status
Subject 2 World Trade Center E91131 entity
Predicate plannedStartOfConstruction P26282 FINISHED
Object 2010s LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2010s | Statement: [2 World Trade Center, plannedStartOfConstruction, 2010s]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedStartOfConstruction
Context triple: [2 World Trade Center, plannedStartOfConstruction, 2010s]
  • A. constructionDate
    Indicates the date on which an entity (such as a building or structure) was constructed or completed.
  • B. datePlanned
    Indicates that a specific date has been scheduled or intended for a particular event, action, or relationship to occur.
  • C. plannedAt chosen
    Indicates that an event, action, or activity is scheduled or intended to occur at a specific time or date.
  • D. constructionStartYear
    Indicates the calendar year in which the construction of something was begun.
  • E. constructionStartAfter
    Indicates that the start of one construction activity or project occurs after the start of another specified construction activity or project.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed960b538819096561c8ed448dec9 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aeeb9a27508190b05e5312cc7c8033 completed March 9, 2026, 3:47 p.m.
PD Predicate disambiguation batch_69aee74dcecc819098285483ec721b40 completed March 9, 2026, 3:29 p.m.
Created at: March 9, 2026, 3:18 p.m.