Triple

T38352285
Position Surface form Disambiguated ID Type / Status
Subject Joseph H. Nicholson E1046221 entity
Predicate term in office (Senate) ended P164732 FINISHED
Object 1809 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1809 | Statement: [Joseph H. Nicholson, term in office (Senate) ended, 1809]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: term in office (Senate) ended
Context triple: [Joseph H. Nicholson, term in office (Senate) ended, 1809]
  • A. term in office (House of Representatives) ended
    Indicates that an individual's period of service as a member of the House of Representatives has concluded.
  • B. termEnd National Senator chosen
    Indicates that a person’s term serving as a national senator has ended.
  • C. secondTermAsSenateMinorityLeaderEnd
    Indicates the date or point in time when an individual’s second term serving as Senate Minority Leader comes to an end.
  • D. succeededInOfficeAsSenatorBy
    Indicates that one senator left office and was directly followed in that same senatorial position by another specific senator.
  • E. congressEndedOn
    Indicates the date or time at which a particular session or term of a congress officially concluded.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e3a94fc81908edc175e8d259e80 completed May 3, 2026, 3:48 p.m.
NER Named-entity recognition batch_69fcda3699948190adb57625bae08091 completed May 7, 2026, 6:30 p.m.
PD Predicate disambiguation batch_69fcd8fd16d08190b0aca6e19a632e99 completed May 7, 2026, 6:25 p.m.
Created at: May 3, 2026, 4:31 p.m.