Triple

T38344630
Position Surface form Disambiguated ID Type / Status
Subject IRT Division (limited connections and yards only) E1041505 entity
Predicate instanceOf P0 FINISHED
Object subset of transit infrastructure C21711 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: subset of transit infrastructure
Context triple: [IRT Division (limited connections and yards only), instanceOf, subset of transit infrastructure]
  • A. public transportation infrastructure
    Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
  • B. public transit system
    A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
  • C. rail transit
    Rail transit is a public transportation system that moves passengers or freight along fixed steel tracks using trains, subways, trams, or light rail vehicles, typically in urban or intercity corridors.
  • D. group of rapid transit lines
    A group of rapid transit lines is a collection of interconnected high-capacity urban rail or metro routes that operate together as a coordinated network to provide frequent, efficient public transportation.
  • E. commuter rail infrastructure chosen
    Commuter rail infrastructure comprises the physical and operational systems—such as tracks, stations, signaling, power, and maintenance facilities—designed to support frequent, reliable passenger train service between suburbs and urban centers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e2ad95481908c920c0e5c1c3e26 completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:30 p.m.