Triple
T38327789
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | International Circuit |
E1036836
|
entity |
| Predicate | previousStartFinishStraight |
P78948
|
FINISHED |
| Object | National Pit Straight |
—
|
NE NERFINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: National Pit Straight | Statement: [International Circuit, previousStartFinishStraight, National Pit Straight]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: previousStartFinishStraight Context triple: [International Circuit, previousStartFinishStraight, National Pit Straight]
-
A.
hasStartFinishStraight
chosen
Indicates that something includes a straight segment that serves as both the starting and finishing section of a course or track.
-
B.
pitStraightDirection
Indicates that a pit or excavation extends in a straight, uncurved direction.
-
C.
mainStraightDirection
Indicates the direction in which the primary or central straight path or segment is oriented or extends.
-
D.
laneStart
Indicates the point or position where a lane begins or first becomes active within a roadway or path.
-
E.
trailStartsFrom
Indicates that the starting point or origin of a trail is located at a specified place or entity.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e1c16fc8190bde982289dd5106b |
completed | May 3, 2026, 3:47 p.m. |
| NER | Named-entity recognition | batch_6a000efe971081909de03f875a7ad6cc |
completed | May 10, 2026, 4:52 a.m. |
| PD | Predicate disambiguation | batch_6a000c4ffe788190a5757af60aadd9f3 |
completed | May 10, 2026, 4:40 a.m. |
Created at: May 3, 2026, 4:30 p.m.