Triple
T38324800
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Nine-Dragon Screen (Beijing) |
E1036754
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | screen wall |
C57814
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: screen wall Context triple: [Nine-Dragon Screen (Beijing), instanceOf, screen wall]
-
A.
galaxy wall
A galaxy wall is a vast, sheet-like large-scale structure in the universe composed of numerous galaxies, clusters, and filaments forming part of the cosmic web.
-
B.
cosmic wall
A cosmic wall is a vast, boundary-like structure in the universe that separates or connects different regions of space, dimensions, or realities, often serving as a barrier, interface, or transition zone for cosmic phenomena.
-
C.
wall covering
A wall covering is a material or finish applied to interior or exterior walls to provide protection, decoration, or functional properties such as insulation or soundproofing.
-
D.
mural panel
A mural panel is a distinct, often rectangular section of a larger wall painting or mural composition, designed as a cohesive visual unit that contributes to the overall narrative or aesthetic.
-
E.
folding screen
chosen
A folding screen is a multi-paneled, hinged partition that can be expanded or collapsed to divide space, provide privacy, or serve as decorative artwork within a room.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76e1c16fc8190bde982289dd5106b |
completed | May 3, 2026, 3:47 p.m. |
Created at: May 3, 2026, 4:30 p.m.