Triple

T38310852
Position Surface form Disambiguated ID Type / Status
Subject Jinan Rail Transit Group E1033678 entity
Predicate instanceOf P0 FINISHED
Object urban rail transit operator C221 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: urban rail transit operator
Context triple: [Jinan Rail Transit Group, instanceOf, urban rail transit operator]
  • A. mass transit operator chosen
    A mass transit operator is an entity responsible for managing, coordinating, and providing public transportation services such as buses, trains, or subways within a specific region or network.
  • B. transport infrastructure operator
    A transport infrastructure operator is an entity responsible for managing, maintaining, and regulating transportation networks and facilities such as roads, railways, ports, or airports to ensure safe and efficient movement of people and goods.
  • C. public transportation agency
    A public transportation agency is an organization responsible for planning, operating, and managing shared transit services such as buses, trains, and other modes to provide mobility for the public within a defined region.
  • D. paratransit operator
    A paratransit operator is a transportation service provider that offers flexible, demand-responsive rides—often door-to-door—for individuals whose disabilities or mobility limitations prevent them from using standard public transit.
  • E. rail transport company
    A rail transport company is an organization that owns, operates, or manages trains and railway infrastructure to provide freight and/or passenger transportation services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76e132c408190969b3d35c04b87ae completed May 3, 2026, 3:47 p.m.
Created at: May 3, 2026, 4:30 p.m.