Triple
T38292422
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Ming calendar |
E1022395
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Chinese calendar |
C2509
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Chinese calendar Context triple: [Ming calendar, instanceOf, Chinese calendar]
-
A.
Chinese cyclical year designation
A Chinese cyclical year designation is a label for a year based on the traditional 60-year cycle formed by combining the ten Heavenly Stems with the twelve Earthly Branches (zodiac animals).
-
B.
lunisolar calendar
chosen
A lunisolar calendar is a dating system that combines lunar months with periodic adjustments to align with the solar year, ensuring that months track the moon’s phases while years remain synchronized with the seasons.
-
C.
Lao New Year
Lao New Year is a traditional Lao festival, usually celebrated in mid-April, that marks the solar new year with water blessings, religious ceremonies, family gatherings, and cultural performances.
-
D.
Javanese calendrical system
The Javanese calendrical system is a syncretic timekeeping framework that combines elements of Hindu-Buddhist, Islamic, and indigenous Javanese traditions into a complex cycle of solar, lunar, and five-day market weeks used for ritual, agricultural, and social purposes.
-
E.
calendar system
A calendar system is a structured method for organizing and measuring time into units such as days, weeks, months, and years to schedule, record, and coordinate events.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76df190f081908d5aa02c8a9286d0 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.