Triple
T38287016
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | B4042 road |
E1022242
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | secondary route |
C8535
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: secondary route Context triple: [B4042 road, instanceOf, secondary route]
-
A.
secondary campus
A secondary campus is a separate physical site or facility that extends the operations, services, or population of a primary institution, such as a school or college, while remaining administratively connected to it.
-
B.
secondary river channel
A secondary river channel is a smaller, subsidiary watercourse that branches from and later rejoins a main river, conveying part of its flow around islands, bars, or floodplain features.
-
C.
secondary peak
A secondary peak is a smaller, subordinate maximum in a distribution, signal, or function that occurs in addition to the primary (highest) peak.
-
D.
secondary waterway
A secondary waterway is a smaller, subordinate channel or route connected to a primary waterway, used to support additional navigation, drainage, or water distribution functions.
-
E.
spur route
chosen
A spur route is a short, secondary road or railway line that branches off from a main route to provide direct access to a specific location or area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76df190f081908d5aa02c8a9286d0 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.