Triple
T38282323
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Suwannee River Water Management District area |
E1022110
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | water management district area |
C19730
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: water management district area Context triple: [Suwannee River Water Management District area, instanceOf, water management district area]
-
A.
watershed district
A watershed district is a geographically defined area governed by an organization responsible for managing water resources, drainage, and related environmental concerns within a specific river or drainage basin.
-
B.
drainage district
A drainage district is a special governmental or quasi-governmental entity created to manage, finance, and maintain systems that remove excess water from land to prevent flooding and improve land usability.
-
C.
irrigated district
An irrigated district is a geographically defined area where water is systematically supplied and managed, typically through infrastructure like canals and pipelines, to support agricultural production and related land uses.
-
D.
water management agency
chosen
A water management agency is an organization responsible for planning, regulating, and overseeing the sustainable allocation, use, and protection of water resources within a defined region.
-
E.
river basin district
A river basin district is a designated geographical area comprising one or more neighboring river basins, including their associated groundwater and coastal waters, managed as a single unit for integrated water resources planning and protection.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76df0cddc81908d16c1556ff4097f |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.