Triple

T38275114
Position Surface form Disambiguated ID Type / Status
Subject Illinois Terminal Railroad E1021925 entity
Predicate endOfElectricOperation P24363 FINISHED
Object 1956 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1956 | Statement: [Illinois Terminal Railroad, endOfElectricOperation, 1956]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: endOfElectricOperation
Context triple: [Illinois Terminal Railroad, endOfElectricOperation, 1956]
  • A. electrificationEnd chosen
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • B. periodInPowerEnd
    Indicates the point in time when an entity’s tenure or period in power comes to an end.
  • C. usesElectricityFor
    Indicates that one entity relies on or employs electricity as the power source to operate, perform a function, or carry out an activity for another entity or purpose.
  • D. electrificationCompleted
    Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
  • E. endOfUsefulOperations
    Indicates that the useful or intended operations of an entity, process, or system have been completed or can no longer be effectively performed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76df0cddc81908d16c1556ff4097f completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fcd1499e2c81909bafd84dc4810f45 completed May 7, 2026, 5:52 p.m.
PD Predicate disambiguation batch_69fcccf024ec819086383ffbb6cfc036 completed May 7, 2026, 5:33 p.m.
Created at: May 3, 2026, 4:30 p.m.