Triple
T38275114
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Illinois Terminal Railroad |
E1021925
|
entity |
| Predicate | endOfElectricOperation |
P24363
|
FINISHED |
| Object | 1956 |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1956 | Statement: [Illinois Terminal Railroad, endOfElectricOperation, 1956]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: endOfElectricOperation Context triple: [Illinois Terminal Railroad, endOfElectricOperation, 1956]
-
A.
electrificationEnd
chosen
Indicates the point in time or event at which an electrification process or electrified state comes to an end.
-
B.
periodInPowerEnd
Indicates the point in time when an entity’s tenure or period in power comes to an end.
-
C.
usesElectricityFor
Indicates that one entity relies on or employs electricity as the power source to operate, perform a function, or carry out an activity for another entity or purpose.
-
D.
electrificationCompleted
Indicates that the process of providing electrical power infrastructure to the relevant entity or area has been fully completed.
-
E.
endOfUsefulOperations
Indicates that the useful or intended operations of an entity, process, or system have been completed or can no longer be effectively performed.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76df0cddc81908d16c1556ff4097f |
completed | May 3, 2026, 3:46 p.m. |
| NER | Named-entity recognition | batch_69fcd1499e2c81909bafd84dc4810f45 |
completed | May 7, 2026, 5:52 p.m. |
| PD | Predicate disambiguation | batch_69fcccf024ec819086383ffbb6cfc036 |
completed | May 7, 2026, 5:33 p.m. |
Created at: May 3, 2026, 4:30 p.m.