Triple

T38267008
Position Surface form Disambiguated ID Type / Status
Subject Stockholm congestion tax E1021091 entity
Predicate instanceOf P0 FINISHED
Object congestion pricing scheme C18840 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: congestion pricing scheme
Context triple: [Stockholm congestion tax, instanceOf, congestion pricing scheme]
  • A. road pricing scheme chosen
    A road pricing scheme is a system for charging drivers fees to use specific roads or areas, typically to manage congestion, reduce environmental impacts, or fund transportation infrastructure.
  • B. traffic management scheme
    A traffic management scheme is a coordinated set of policies, controls, and infrastructure measures designed to regulate and optimize the movement of vehicles, pedestrians, and goods within a transportation network.
  • C. public transport pricing scheme
    A public transport pricing scheme is a structured set of rules and fares that determines how passengers are charged for using public transit services based on factors such as distance, time, mode, and user category.
  • D. high-occupancy toll lanes
    High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
  • E. transponder-based toll system
    A transponder-based toll system is an automated electronic toll collection method where vehicles equipped with small radio-frequency devices are detected and charged as they pass through toll points without stopping.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dee198c8190bf5109421e47a658 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:30 p.m.