Triple
T38266975
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Norra länken |
E1021090
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | urban motorway link |
C50341
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: urban motorway link Context triple: [Norra länken, instanceOf, urban motorway link]
-
A.
urban beltway
An urban beltway is a high-capacity circumferential highway or roadway system that encircles a city to route traffic around its core, reduce congestion, and connect radial routes and suburbs.
-
B.
urban arterial road
An urban arterial road is a high-capacity city street designed to carry large volumes of traffic efficiently between local streets and major highways while providing controlled access to adjacent land uses.
-
C.
urban junction
An urban junction is a point where multiple city streets or transportation routes intersect, facilitating the flow and regulation of vehicular, pedestrian, and sometimes transit traffic within an urban network.
-
D.
highway connection
chosen
A highway connection is a road segment or interchange that links two or more highways or major roads, enabling continuous vehicular travel between them.
-
E.
motorway
A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dee198c8190bf5109421e47a658 |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.