Triple

T38261577
Position Surface form Disambiguated ID Type / Status
Subject 42 Jakarta E1017941 entity
Predicate instanceOf P0 FINISHED
Object campus of 42 Network C41837 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: campus of 42 Network
Context triple: [42 Jakarta, instanceOf, campus of 42 Network]
  • A. multi-campus educational network chosen
    A multi-campus educational network is an interconnected system of geographically distributed campuses that share academic programs, resources, governance, and support services to deliver coordinated, high-quality education across multiple locations.
  • B. campus axis
    A campus axis is a primary organizing line or pathway that structures the spatial layout, circulation, and visual relationships of buildings and open spaces across a campus.
  • C. campus gateway
    A campus gateway is a prominent architectural or landscaped entrance feature that marks the transition from the surrounding community into the defined grounds of an educational institution.
  • D. campus
    A campus is a defined area of land that houses the buildings, facilities, and open spaces of an educational institution, supporting academic, residential, and social activities.
  • E. university satellite campus
    A university satellite campus is a geographically separate branch of a main university that offers selected academic programs and services to extend access to higher education in a different location.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76de33e4481909099fa812709bd42 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:30 p.m.