Triple
T38243502
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pont Samson |
E1013831
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | infrastructure de transport |
C4130
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: infrastructure de transport Context triple: [Pont Samson, instanceOf, infrastructure de transport]
-
A.
transport sector
The transport sector encompasses all systems, services, and infrastructure involved in moving people and goods by road, rail, air, and water.
-
B.
transport infrastructure network
chosen
A transport infrastructure network is an interconnected system of physical routes and facilities—such as roads, railways, ports, and airports—designed to enable the efficient movement of people and goods across regions.
-
C.
public transportation infrastructure
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
D.
public transport technology
Public transport technology encompasses the systems, vehicles, infrastructure, and digital tools used to plan, operate, and optimize shared transportation services such as buses, trains, trams, and metros.
-
E.
transportation index
A transportation index is a composite measure that tracks the performance, activity, or cost trends of the transportation sector (such as shipping, rail, air, and trucking) over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dd7e89c8190b7866bc85aea521b |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.