Triple

T38240235
Position Surface form Disambiguated ID Type / Status
Subject Main Line 1 E1013741 entity
Predicate plannedElectrification P158148 FINISHED
Object yes LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: yes | Statement: [Main Line 1, plannedElectrification, yes]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: plannedElectrification
Context triple: [Main Line 1, plannedElectrification, yes]
  • A. isElectrificationPlanned chosen
    Indicates that there is an intention or scheduled plan to add or upgrade electrical infrastructure or services to the referenced entity or area.
  • B. electrification
    Indicates the process or state of providing electrical power or converting something to operate using electricity.
  • C. electrificationEnd
    Indicates the point in time or event at which an electrification process or electrified state comes to an end.
  • D. electrificationSystem
    Indicates the type of electrical power system used to supply energy (typically to infrastructure or vehicles) for operation.
  • E. electrificationIncludes
    Indicates that a broader electrification process or project encompasses, contains, or makes use of a specified component, measure, or sub-activity.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd72a248190a5fe18db2bd1eb15 completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fd68abf52881909c5a390c362b7c59 completed May 8, 2026, 4:38 a.m.
PD Predicate disambiguation batch_69fd6812d0c88190930d8fa2d4b92490 completed May 8, 2026, 4:35 a.m.
Created at: May 3, 2026, 4:30 p.m.