Triple

T38239952
Position Surface form Disambiguated ID Type / Status
Subject Operation Hush E1013733 entity
Predicate instanceOf P0 FINISHED
Object World War I operation C20682 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: World War I operation
Context triple: [Operation Hush, instanceOf, World War I operation]
  • A. World War I military operation chosen
    A World War I military operation is a coordinated set of strategic and tactical actions conducted by armed forces during the First World War to achieve specific military objectives within a defined time and geographic area.
  • B. World War I battle
    A World War I battle is a large-scale, often prolonged military engagement between opposing forces during the 1914–1918 global conflict, characterized by trench warfare, industrialized weaponry, and significant casualties.
  • C. World War I military formation
    A World War I military formation is an organized grouping of soldiers, equipment, and command structures arranged for combat operations according to the tactical doctrines and technological constraints of the 1914–1918 conflict.
  • D. aspect of World War I
    An aspect of World War I is a distinct thematic element—such as military strategy, technological innovation, political diplomacy, social impact, or cultural memory—that characterizes and helps explain the nature and consequences of the conflict.
  • E. World War I air operations
    World War I air operations encompass the use of aircraft for reconnaissance, air combat, bombing, and support missions that transformed military strategy and technology in the early 20th century.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd72a248190a5fe18db2bd1eb15 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:30 p.m.