Triple

T38231820
Position Surface form Disambiguated ID Type / Status
Subject A1 E1013509 entity
Predicate instanceOf P0 FINISHED
Object CEFR level C38299 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: CEFR level
Context triple: [A1, instanceOf, CEFR level]
  • A. language proficiency scale chosen
    A language proficiency scale is a structured framework that categorizes and describes a learner’s ability to understand, speak, read, and write a language across progressive levels of competence.
  • B. level
    A level is a defined stage, layer, or degree within a structured system that indicates relative position, progression, or intensity.
  • C. language proficiency assessment
    A language proficiency assessment is a systematic evaluation tool designed to measure an individual's ability to understand, speak, read, and write in a specific language across defined competency levels.
  • D. language qualification
    A language qualification is a formal certification or credential that verifies an individual's proficiency level in a specific language according to recognized standards.
  • E. two-level grammar
    A two-level grammar is a formal grammar system that separates the description of valid symbol sequences into two layers—typically a context-free base level and a more restrictive metalevel—to capture complex syntactic or structural constraints more expressively than a single-level grammar.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd72a248190a5fe18db2bd1eb15 completed May 3, 2026, 3:46 p.m.
Created at: May 3, 2026, 4:30 p.m.