Triple
T38227665
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | So Small |
E1012193
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | compact roller coaster track design |
C29190
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: compact roller coaster track design Context triple: [So Small, instanceOf, compact roller coaster track design]
-
A.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
-
B.
roller coaster concept
chosen
A roller coaster concept is a high-level design blueprint that defines the ride’s theme, layout, key elements, and overall experience before detailed engineering and construction begin.
-
C.
steel roller coaster
A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
-
D.
stand-up roller coaster
A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
-
E.
inverted roller coaster
An inverted roller coaster is a type of roller coaster where the train travels beneath the track with riders’ legs dangling freely, creating intense, suspended-feeling maneuvers and inversions.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dd25e0c81909f2abd0803e5e3ee |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.