Triple
T38223081
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | German ICE |
E1012064
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-speed train system |
C51991
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-speed train system Context triple: [German ICE, instanceOf, high-speed train system]
-
A.
high-speed railway
chosen
A high-speed railway is a rail transport system designed for trains that operate at significantly higher speeds than traditional rail services, typically on specially built or upgraded tracks, to provide fast, efficient, and reliable long-distance passenger travel.
-
B.
rapid rail system
A rapid rail system is a high-speed, high-capacity railway network designed to transport large numbers of passengers quickly and efficiently between urban or regional destinations using dedicated tracks and frequent service.
-
C.
high-speed test train
A high-speed test train is a specialized railway vehicle designed to operate at very high velocities to evaluate, validate, and optimize track infrastructure, signaling systems, and rolling stock performance under extreme operating conditions.
-
D.
high-speed electric multiple unit train
A high-speed electric multiple unit train is a self-propelled, electrically powered passenger trainset composed of multiple interconnected cars, designed to operate at very high speeds with rapid acceleration, efficient braking, and streamlined aerodynamics for intercity or regional service.
-
E.
proposed high-speed ground transportation system
A proposed high-speed ground transportation system is a conceptual network of advanced vehicles, infrastructure, and control technologies designed to move passengers or freight rapidly and efficiently between destinations along dedicated terrestrial corridors.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dd25e0c81909f2abd0803e5e3ee |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.