Triple

T38223048
Position Surface form Disambiguated ID Type / Status
Subject West Division E1012062 entity
Predicate hasSchedulingImpact P26550 FINISHED
Object increased frequency of games among divisional opponents LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: increased frequency of games among divisional opponents | Statement: [West Division, hasSchedulingImpact, increased frequency of games among divisional opponents]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasSchedulingImpact
Context triple: [West Division, hasSchedulingImpact, increased frequency of games among divisional opponents]
  • A. requiresSchedule
    Indicates that an entity must have a planned schedule or timetable established before it can occur, operate, or be fulfilled.
  • B. effectOnSchedule chosen
    Indicates how an event, action, or condition changes, disrupts, or influences a planned schedule or timeline.
  • C. hasOperationalImpactOn
    Indicates that one entity’s functioning, performance, or status directly affects the operation or effectiveness of another entity.
  • D. usedForScheduling
    Indicates that something is employed to plan, arrange, or coordinate the timing of events, tasks, or activities.
  • E. isScheduled
    Indicates that an event, task, or action has been planned and assigned a specific time or time range to occur.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76dd25e0c81909f2abd0803e5e3ee completed May 3, 2026, 3:46 p.m.
NER Named-entity recognition batch_69fdb45537288190b6791078d4a6899f completed May 8, 2026, 10 a.m.
PD Predicate disambiguation batch_69fdb39ad96481908376d7def9fafc13 completed May 8, 2026, 9:57 a.m.
Created at: May 3, 2026, 4:30 p.m.