Triple
T38221647
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Borg transwarp conduit |
E1012025
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transwarp conduit |
C32543
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transwarp conduit Context triple: [Borg transwarp conduit, instanceOf, transwarp conduit]
-
A.
tunnel portal
A tunnel portal is the structural entrance or exit of a tunnel where the underground passage meets the open environment, often designed to manage loads, drainage, and traffic transition.
-
B.
warp hub
chosen
A warp hub is a central nexus or station that connects multiple locations or dimensions, enabling rapid or instantaneous travel between them.
-
C.
teleportation network
A teleportation network is a system of interconnected nodes and pathways that instantaneously transfers objects or individuals between locations according to defined rules and constraints.
-
D.
tunneling system
A tunneling system is a conceptual framework or infrastructure that enables data, particles, or signals to pass through barriers or intermediate layers via a protected or probabilistic pathway without directly traversing the intervening space in a conventional manner.
-
E.
teleportation device
A teleportation device is a machine that instantaneously transports objects or people from one location to another by disassembling them at the origin and reassembling them at the destination.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dd25e0c81909f2abd0803e5e3ee |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.