Triple
T38209576
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | North American Bridge Championship titles |
E1010501
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | contract bridge honor |
C1343
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: contract bridge honor Context triple: [North American Bridge Championship titles, instanceOf, contract bridge honor]
-
A.
private bridge
A private bridge is a non-publicly owned structure that spans a physical obstacle, such as a river or road, to provide controlled access exclusively for specific individuals, properties, or organizations.
-
B.
bridge authority
A bridge authority is an entity responsible for the planning, construction, operation, maintenance, and regulation of a bridge or network of bridges, including safety, tolling, and compliance with relevant laws and standards.
-
C.
bridge player
chosen
A bridge player is an individual who participates in the card game contract bridge, using strategy, memory, and partnership communication to bid and play hands competitively or recreationally.
-
D.
chain bridge
A chain bridge is a type of suspension bridge in which the deck is supported by chains or linked metal bars draped over towers and anchored at both ends.
-
E.
bridge approach
A bridge approach is the section of roadway that transitions between the ground and the main span of a bridge, providing a smooth and stable connection for vehicles and pedestrians.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dcdc7708190a5f1751d53f40ffe |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:30 p.m.