Triple
T38196016
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Falcon SuperChair |
E1005612
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | high-speed chairlift |
C31325
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: high-speed chairlift Context triple: [Falcon SuperChair, instanceOf, high-speed chairlift]
-
A.
detachable quad chairlift
chosen
A detachable quad chairlift is a ski lift system with four-person chairs that detach from the moving cable in stations to slow for loading and unloading while the main cable continues at higher speed.
-
B.
ski lift area
A ski lift area is a designated zone at a ski resort where skiers and snowboarders load onto and unload from ski lifts, often including queues, safety signage, and access control.
-
C.
shoot-the-chute ride
A shoot-the-chute ride is an amusement attraction where a flat-bottomed boat ascends a lift and then plunges down a steep flume into a splash pool, creating a dramatic water spray for riders and spectators.
-
D.
rotating gondola lift
A rotating gondola lift is an aerial cable transport system in which enclosed cabins continuously circulate along a looped cable, allowing passengers to board and disembark while the cabins move slowly through stations.
-
E.
roller coaster
A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dbd22f48190940318cea061e8bb |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:29 p.m.