Triple
T38185420
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ASTM C115 |
E1005302
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | cement test method |
C2409
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: cement test method Context triple: [ASTM C115, instanceOf, cement test method]
-
A.
cement standard
chosen
A cement standard is a defined specification or guideline that establishes the required properties, performance criteria, and testing methods for cement to ensure quality, safety, and consistency in construction applications.
-
B.
cement company
A cement company is a business entity that manufactures and supplies cement and related construction materials for use in building and infrastructure projects.
-
C.
natural hydraulic cement
Natural hydraulic cement is a type of cement produced by calcining naturally occurring limestone containing clay and other minerals, which hardens and gains strength through chemical reactions with water.
-
D.
construction material
A construction material is any substance or product used in building and civil engineering works to form, support, protect, or finish structures.
-
E.
mortar
A mortar is a sturdy, bowl-shaped vessel used with a pestle to crush, grind, or mix solid substances into finer particles or pastes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76dbc22c481908139b694ffde7a0c |
completed | May 3, 2026, 3:46 p.m. |
Created at: May 3, 2026, 4:29 p.m.