Triple

T3813179
Position Surface form Disambiguated ID Type / Status
Subject National Capital Region E93183 entity
Predicate containsMajorExpressway P7229 FINISHED
Object Delhi–Gurugram Expressway
The Delhi–Gurugram Expressway is a major high-speed corridor connecting Delhi with the city of Gurugram in Haryana, forming a key segment of India’s National Highway network and a primary gateway to the national capital.
E393141 NE FINISHED

How this triple was built (4 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Gurugram Expressway | Statement: [National Capital Region, containsMajorExpressway, Delhi–Gurugram Expressway]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: Delhi–Gurugram Expressway
Context triple: [National Capital Region, containsMajorExpressway, Delhi–Gurugram Expressway]
  • A. Delhi–Meerut Expressway
    The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
  • B. Delhi–Mumbai Expressway
    The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
  • C. Noida–Greater Noida Expressway
    The Noida–Greater Noida Expressway is a major high-speed road corridor in the National Capital Region of India that connects the cities of Noida and Greater Noida and serves as a key route for commuters and commercial traffic.
  • D. Yamuna Expressway
    The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
  • E. Agra–Lucknow Expressway
    The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
  • F. None of above. chosen
  • G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg Description generation gpt-5.1
Instruction
Generate a one-sentence description of the target entity. 
You are given a context triple in the form (subject, predicate, object), where the object is the target entity. 
# Instructions
Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. 
Avoid repeating the information from the triple, unless really essential.
# Response Format
Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: Delhi–Gurugram Expressway
Triple: [National Capital Region, containsMajorExpressway, Delhi–Gurugram Expressway]
Generated description
The Delhi–Gurugram Expressway is a major high-speed corridor connecting Delhi with the city of Gurugram in Haryana, forming a key segment of India’s National Highway network and a primary gateway to the national capital.
NED2 Entity disambiguation (via description) gpt-5-mini-2025-08-07
Target entity: Delhi–Gurugram Expressway
Target entity description: The Delhi–Gurugram Expressway is a major high-speed corridor connecting Delhi with the city of Gurugram in Haryana, forming a key segment of India’s National Highway network and a primary gateway to the national capital.
  • A. Delhi–Meerut Expressway
    The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
  • B. Delhi–Mumbai Expressway
    The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
  • C. Noida–Greater Noida Expressway
    The Noida–Greater Noida Expressway is a major high-speed road corridor in the National Capital Region of India that connects the cities of Noida and Greater Noida and serves as a key route for commuters and commercial traffic.
  • D. Yamuna Expressway
    The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
  • E. Agra–Lucknow Expressway
    The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
  • F. None of above. chosen

Provenance (5 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed96a60088190ab1df8390fffc935 completed March 9, 2026, 2:30 p.m.
NER Named-entity recognition batch_69aef90ce3088190b82e8421ce9a4005 completed March 9, 2026, 4:45 p.m.
NED1 Entity disambiguation (via context triple) batch_69b503f549b0819088b64ddb3f38238f completed March 14, 2026, 6:45 a.m.
NEDg Description generation batch_69b504e663a08190b2d462da2b725469 completed March 14, 2026, 6:49 a.m.
NED2 Entity disambiguation (via description) batch_69b50534242c8190a1d4658e7896c2be completed March 14, 2026, 6:50 a.m.
Created at: March 9, 2026, 3:16 p.m.