Triple
T3813178
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | National Capital Region |
E93183
|
entity |
| Predicate | containsMajorExpressway |
P7229
|
FINISHED |
| Object | Delhi–Meerut Expressway |
E121066
|
NE FINISHED |
How this triple was built (3 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Delhi–Meerut Expressway | Statement: [National Capital Region, containsMajorExpressway, Delhi–Meerut Expressway]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: Delhi–Meerut Expressway Context triple: [National Capital Region, containsMajorExpressway, Delhi–Meerut Expressway]
-
A.
Delhi–Meerut Expressway
chosen
The Delhi–Meerut Expressway is a high-speed, access-controlled highway in northern India designed to significantly reduce travel time and improve connectivity between Delhi and the city of Meerut.
-
B.
Delhi–Mumbai Expressway
The Delhi–Mumbai Expressway is a major under-construction, high-speed, access-controlled highway designed to significantly reduce travel time and boost connectivity between India’s national capital, Delhi, and its financial hub, Mumbai.
-
C.
Yamuna Expressway
The Yamuna Expressway is a high-speed, six-lane toll road in northern India that connects Greater Noida with Agra, significantly reducing travel time between Delhi and the Taj Mahal region.
-
D.
Noida–Greater Noida Expressway
The Noida–Greater Noida Expressway is a major high-speed road corridor in the National Capital Region of India that connects the cities of Noida and Greater Noida and serves as a key route for commuters and commercial traffic.
-
E.
Agra–Lucknow Expressway
The Agra–Lucknow Expressway is a major six-lane, access-controlled expressway in India that significantly reduces travel time between Agra and the state capital Lucknow and serves as a key transport and economic corridor in Uttar Pradesh.
- F. None of above.
- G. Unsure - the case is ambiguous/there is not enough information to decide.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: containsMajorExpressway Context triple: [National Capital Region, containsMajorExpressway, Delhi–Meerut Expressway]
-
A.
hasMajorHighway
Indicates that a location or area is served by or directly connected to a major highway route.
-
B.
isMajorRoadIn
Indicates that a road is classified as a major road within a specified geographic area or jurisdiction.
-
C.
hasExpresswaySection
chosen
Indicates that an entity includes, contains, or is associated with a specific section or segment of an expressway.
-
D.
hasMajorRouteType
Indicates that an entity is associated with a primary classification of transportation route (such as highway, rail line, or other major route type).
-
E.
hasMajorTransportationRole
Indicates that an entity plays a primary or significant role in providing or supporting transportation services or infrastructure.
- F. None of above.
Provenance (4 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69aed96a60088190ab1df8390fffc935 |
completed | March 9, 2026, 2:30 p.m. |
| NER | Named-entity recognition | batch_69aef1515c688190a38332aedeed8a76 |
completed | March 9, 2026, 4:12 p.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69b4fb3a69908190ba8e7ac37c8ca0f8 |
completed | March 14, 2026, 6:07 a.m. |
| PD | Predicate disambiguation | batch_69aee7482d708190a3ec74745b102a4c |
completed | March 9, 2026, 3:29 p.m. |
Created at: March 9, 2026, 3:16 p.m.