Triple
T38131249
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | FIA Grade 2 |
E952226
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | motorsport circuit homologation standard |
C30572
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: motorsport circuit homologation standard Context triple: [FIA Grade 2, instanceOf, motorsport circuit homologation standard]
-
A.
FIA circuit grading standard
chosen
The FIA circuit grading standard is a classification system that assigns safety and technical grades to motor racing circuits based on their design, infrastructure, and suitability for different categories of competition.
-
B.
motorsport regulations
Motorsport regulations are the formal rules and standards that govern the conduct, safety, technical specifications, and competitive fairness of organized motor racing events.
-
C.
racing circuit
A racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure where competitive motor or bicycle races are held.
-
D.
motorcycle racing circuit
A motorcycle racing circuit is a purpose-built or adapted closed course featuring straights, curves, and safety infrastructure designed specifically for competitive motorcycle racing.
-
E.
motorsport venue
A motorsport venue is a specialized facility designed and equipped to host competitive motor racing events, including tracks, spectator areas, and supporting infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76f083548819082bd2bbf53c79e8e |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:21 p.m.