Triple

T38085121
Position Surface form Disambiguated ID Type / Status
Subject Bonneville Power Administration E950955 entity
Predicate primaryGenerationFacilities GENERATED
Object federal hydroelectric dams UNRECOGNIZED GENERATED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: primaryGenerationFacilities
Context triple: [Bonneville Power Administration, primaryGenerationFacilities, federal hydroelectric dams]
  • A. mainFacilityConstructed
    Indicates that the primary facility associated with an entity has been built or completed.
  • B. productionFacilityType
    Indicates the specific kind or category of facility where production or manufacturing activities take place.
  • C. plannedPowerplant
    Indicates that a power plant is intended or scheduled to be built or developed, but is not yet constructed or operational.
  • D. plannedFacility
    Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
  • E. permanentInfrastructure
    Indicates that the relationship involves infrastructure that is intended to be long-lasting, fixed in place, and not temporary or easily removable.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76f03a3608190a73fd6df87c792a8 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:21 p.m.