Triple
T38085121
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bonneville Power Administration |
E950955
|
entity |
| Predicate | primaryGenerationFacilities |
—
|
GENERATED |
| Object | federal hydroelectric dams |
—
|
UNRECOGNIZED GENERATED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: primaryGenerationFacilities Context triple: [Bonneville Power Administration, primaryGenerationFacilities, federal hydroelectric dams]
-
A.
mainFacilityConstructed
Indicates that the primary facility associated with an entity has been built or completed.
-
B.
productionFacilityType
Indicates the specific kind or category of facility where production or manufacturing activities take place.
-
C.
plannedPowerplant
Indicates that a power plant is intended or scheduled to be built or developed, but is not yet constructed or operational.
-
D.
plannedFacility
Indicates that a facility is intended or scheduled to be built, established, or implemented in the future but does not yet exist or operate.
-
E.
permanentInfrastructure
Indicates that the relationship involves infrastructure that is intended to be long-lasting, fixed in place, and not temporary or easily removable.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76f03a3608190a73fd6df87c792a8 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:21 p.m.