Triple

T38036942
Position Surface form Disambiguated ID Type / Status
Subject Geha Highway E949375 entity
Predicate hasImprovementPlan P79042 FINISHED
Object widening and interchange upgrades LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: widening and interchange upgrades | Statement: [Geha Highway, hasImprovementPlan, widening and interchange upgrades]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasImprovementPlan
Context triple: [Geha Highway, hasImprovementPlan, widening and interchange upgrades]
  • A. hasImprovementProgram chosen
    Indicates that an entity is associated with, participates in, or is covered by a program specifically designed to improve its performance, condition, or quality.
  • B. hasManagementPlan
    Indicates that an entity is associated with a defined management plan specifying how it should be overseen, maintained, or administered.
  • C. hasReconstructionPlan
    Indicates that there exists a defined plan or strategy for rebuilding, restoring, or reconstructing a given entity or system.
  • D. hasImproved
    Indicates that an entity’s state, quality, or performance has become better compared to a previous point in time.
  • E. managementPlanSpecifies
    Indicates that a management plan explicitly defines or details specific actions, procedures, or conditions to be followed.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76eff0bb0819084bc4e63997bd039 completed May 3, 2026, 3:51 p.m.
NER Named-entity recognition batch_69fd35d108908190b79b1e8e6bbd62aa completed May 8, 2026, 1:01 a.m.
PD Predicate disambiguation batch_69fd34cb46108190b43c3b7f67ec4cd4 completed May 8, 2026, 12:56 a.m.
Created at: May 3, 2026, 4:20 p.m.