Triple
T37988227
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Piano Sonata No. 19 in G minor, Op. 49 No. 1 |
E947753
|
entity |
| Predicate | technicalDemandDescription |
P60268
|
FINISHED |
| Object | modest technical demands |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: modest technical demands | Statement: [Piano Sonata No. 19 in G minor, Op. 49 No. 1, technicalDemandDescription, modest technical demands]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: technicalDemandDescription Context triple: [Piano Sonata No. 19 in G minor, Op. 49 No. 1, technicalDemandDescription, modest technical demands]
-
A.
technicalDemand
chosen
Indicates that one entity requires or imposes a certain level of technical skill, complexity, or resources on another entity.
-
B.
serviceRequirementDetail
Indicates that a specific requirement or condition is associated with the provision or performance of a service.
-
C.
componentRequirement
Indicates that one component depends on or necessitates the presence or use of another component to function or be considered complete.
-
D.
typicalRequirement
Indicates that one entity is a standard or commonly expected prerequisite, condition, or necessity for another entity.
-
E.
technicalCrux
Indicates a key technical challenge or bottleneck that critically determines the feasibility or success of a solution or system.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ef8a1d08190a741bbbc5970e3b3 |
completed | May 3, 2026, 3:51 p.m. |
| NER | Named-entity recognition | batch_69fbc995dc2481908b3bd4217f8101e7 |
completed | May 6, 2026, 11:07 p.m. |
| PD | Predicate disambiguation | batch_69fbc8ee04f08190977b7ad70fc85896 |
completed | May 6, 2026, 11:04 p.m. |
Created at: May 3, 2026, 4:20 p.m.