Triple

T37971312
Position Surface form Disambiguated ID Type / Status
Subject Jamaica Bridge (Glasgow) E947292 entity
Predicate instanceOf P0 FINISHED
Object bridge over the River Clyde C41594 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge over the River Clyde
Context triple: [Jamaica Bridge (Glasgow), instanceOf, bridge over the River Clyde]
  • A. bridge over the River Mersey
    A bridge over the River Mersey is a structure that spans the river to provide a transportation route connecting communities on its opposite banks.
  • B. bridge over the River Trent
    A bridge over the River Trent is a structural crossing that spans the river to connect its banks, enabling the movement of people, vehicles, or goods across the waterway.
  • C. bridge in Glasgow chosen
    A bridge in Glasgow is a structural crossing, often spanning the River Clyde, that connects different parts of the city and supports vehicular, rail, or pedestrian traffic while contributing to the urban landscape.
  • D. bridge in Edinburgh
    A bridge in Edinburgh is a structural crossing—often historic or architecturally distinctive—that spans natural or urban obstacles within the city, facilitating the movement of people, vehicles, or rail.
  • E. iron bridge
    An iron bridge is a structural crossing composed primarily of iron elements, designed to span physical obstacles such as rivers or valleys while supporting loads like vehicles, pedestrians, or trains.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef7db908190bba6086673a32300 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:20 p.m.