Triple
T37953269
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Luxembourg–Wasserbillig railway line |
E946798
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | railway infrastructure in Luxembourg |
C3584
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: railway infrastructure in Luxembourg Context triple: [Luxembourg–Wasserbillig railway line, instanceOf, railway infrastructure in Luxembourg]
-
A.
railway infrastructure element
A railway infrastructure element is any physical component of a rail system—such as tracks, signals, switches, bridges, or platforms—that supports the safe and efficient operation of trains.
-
B.
railway network
A railway network is an interconnected system of tracks, stations, signaling, and rolling stock that enables the organized movement of trains between multiple locations.
-
C.
private railway
A private railway is a rail transport system owned and operated by a non-governmental entity, typically for exclusive use in serving specific industrial, commercial, or regional transportation needs.
-
D.
rail transportation infrastructure
chosen
Rail transportation infrastructure encompasses the physical and organizational systems—such as tracks, stations, signaling, power supply, and related facilities—required to support the safe and efficient movement of trains and rail-based services.
-
E.
public railway
A public railway is a government- or publicly-owned rail transport system that provides scheduled passenger and/or freight services accessible to the general population, typically operating on standardized tracks and infrastructure.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ef64cf08190ad3e1114b62aac67 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:20 p.m.