Triple
T37948096
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Port Jefferson Branch |
E946662
|
entity |
| Predicate | hasNonElectrifiedSection |
—
|
GENERATED |
| Object | Huntington to Port Jefferson |
—
|
UNRECOGNIZED GENERATED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: hasNonElectrifiedSection Context triple: [Port Jefferson Branch, hasNonElectrifiedSection, Huntington to Port Jefferson]
-
A.
nonElectrifiedSection
chosen
Indicates that a segment of a transportation or track network lacks electrical infrastructure for powered operation.
-
B.
isElectrifiedSectionOf
Indicates that one section or segment is a part of a larger entity and has been equipped with electrical power or electrification.
-
C.
isElectrifiedSince
Indicates that an entity has had electrical power or electrification continuously from a specified point in time onward.
-
D.
isElectricRailway
Indicates that a given railway system operates using electric power rather than diesel or other forms of propulsion.
-
E.
electrifiedAlongMostOfRoute
Indicates that the route is equipped with electric power infrastructure along the majority of its length, but not necessarily its entirety.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ef64cf08190ad3e1114b62aac67 |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:20 p.m.