Triple
T37930283
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Phobia Phear Coaster |
E946196
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | steel launched roller coaster |
C4663
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: steel launched roller coaster Context triple: [Phobia Phear Coaster, instanceOf, steel launched roller coaster]
-
A.
steel roller coaster
A steel roller coaster is a high-speed amusement ride featuring smooth, tubular steel tracks that enable complex inversions, steep drops, and precise, controlled maneuvers for riders.
-
B.
steel-wood roller coaster
A steel-wood roller coaster is a hybrid amusement ride that combines a traditional wooden support structure with steel track to deliver a smoother yet classic-feeling coaster experience.
-
C.
launched roller coaster
chosen
A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
-
D.
stand-up roller coaster
A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
-
E.
Bolliger & Mabillard roller coaster
A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69f76ef3b7248190892fb9706423be7c |
completed | May 3, 2026, 3:51 p.m. |
Created at: May 3, 2026, 4:20 p.m.