Triple

T37930086
Position Surface form Disambiguated ID Type / Status
Subject Zoomerang E946191 entity
Predicate instanceOf P0 FINISHED
Object Boomerang roller coaster C4764 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Boomerang roller coaster
Context triple: [Zoomerang, instanceOf, Boomerang roller coaster]
  • A. Bolliger & Mabillard roller coaster
    A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
  • B. stand-up roller coaster
    A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
  • C. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • D. inverted roller coaster
    An inverted roller coaster is a type of roller coaster where the train travels beneath the track with riders’ legs dangling freely, creating intense, suspended-feeling maneuvers and inversions.
  • E. roller coaster chosen
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef3b7248190892fb9706423be7c completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:20 p.m.