Triple

T37916590
Position Surface form Disambiguated ID Type / Status
Subject Summit Express chairlift E945834 entity
Predicate instanceOf P0 FINISHED
Object detachable chairlift C31325 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: detachable chairlift
Context triple: [Summit Express chairlift, instanceOf, detachable chairlift]
  • A. detachable quad chairlift chosen
    A detachable quad chairlift is a ski lift system with four-person chairs that detach from the moving cable in stations to slow for loading and unloading while the main cable continues at higher speed.
  • B. rotating gondola lift
    A rotating gondola lift is an aerial cable transport system in which enclosed cabins continuously circulate along a looped cable, allowing passengers to board and disembark while the cabins move slowly through stations.
  • C. cable car system
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • D. ski lift area
    A ski lift area is a designated zone at a ski resort where skiers and snowboarders load onto and unload from ski lifts, often including queues, safety signage, and access control.
  • E. cable car station
    A cable car station is a designated facility where passengers board, disembark, and transfer between cable-propelled vehicles, typically featuring platforms, ticketing areas, and equipment for operating and maintaining the cable system.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef2ebd88190be5229f2621070b3 completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:20 p.m.