Triple

T3791119
Position Surface form Disambiguated ID Type / Status
Subject PPG Place E89648 entity
Predicate hasPart P35 FINISHED
Object PPG Place Plaza E89648 NE FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: PPG Place Plaza | Statement: [PPG Place, hasPart, PPG Place Plaza]
NED1 Entity disambiguation (via context triple) gpt-5-mini-2025-08-07
Target entity: PPG Place Plaza
Context triple: [PPG Place, hasPart, PPG Place Plaza]
  • A. PPG Place chosen
    PPG Place is a landmark glass-clad office and retail complex in downtown Pittsburgh, renowned for its neo-Gothic design by architect Philip Johnson.
  • B. Pennzoil Place
    Pennzoil Place is a landmark pair of trapezoidal skyscrapers in downtown Houston, Texas, celebrated for their innovative postmodern design and dramatic silhouette.
  • C. Riverfront Plaza
    Riverfront Plaza is a public riverfront park and event space in downtown Hartford, Connecticut, featuring walkways, performance areas, and scenic views along the Connecticut River.
  • D. Embarcadero Center
    Embarcadero Center is a large mixed-use commercial complex in downtown San Francisco known for its office towers, shops, restaurants, and public plazas.
  • E. Momentum Place
    Momentum Place was the original name of the prominent postmodern skyscraper in downtown Dallas now known as Comerica Bank Tower.
  • F. None of above.
  • G. Unsure - the case is ambiguous/there is not enough information to decide.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69aed9597d6881909b6ee3b9de859223 completed March 9, 2026, 2:29 p.m.
NER Named-entity recognition batch_69aee7687c4481908d5e6988e2638b68 completed March 9, 2026, 3:29 p.m.
NED1 Entity disambiguation (via context triple) batch_69b5282f253c81908c18a30bb1025f99 completed March 14, 2026, 9:19 a.m.
Created at: March 9, 2026, 3:15 p.m.