Triple

T37901571
Position Surface form Disambiguated ID Type / Status
Subject Allegro train service E945426 entity
Predicate stoppedOperating P17360 FINISHED
Object 2022 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2022 | Statement: [Allegro train service, stoppedOperating, 2022]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: stoppedOperating
Context triple: [Allegro train service, stoppedOperating, 2022]
  • A. ceasedOperation chosen
    Indicates that an entity has stopped functioning, operating, or carrying out its activities, typically in a permanent or indefinite manner.
  • B. ceasedOperationAfter
    Indicates that one entity stopped functioning, operating, or being active after another specified event or entity’s operation ended.
  • C. stoppedBy
    Indicates that one entity causes another entity to cease moving, operating, or continuing an action.
  • D. operatingStatus
    Indicates whether an entity is currently functioning, active, or in service versus inactive, closed, or out of service.
  • E. stoppedAt
    Indicates that an entity has come to a halt or pause at a specific location or point in time.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef20bb0819088b5b6ceecb0b8fc completed May 3, 2026, 3:51 p.m.
NER Named-entity recognition batch_69fbc36ce1f88190a7fa1656b714e107 completed May 6, 2026, 10:40 p.m.
PD Predicate disambiguation batch_69fbbd166a488190b1bf9316b0790801 completed May 6, 2026, 10:13 p.m.
Created at: May 3, 2026, 4:20 p.m.