Triple

T37891257
Position Surface form Disambiguated ID Type / Status
Subject Kiddi Koaster E945144 entity
Predicate instanceOf P0 FINISHED
Object children's roller coaster C65859 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: children's roller coaster
Context triple: [Kiddi Koaster, instanceOf, children's roller coaster]
  • A. launched roller coaster
    A launched roller coaster is a type of roller coaster that uses propulsion systems such as linear motors, hydraulic launches, or compressed air to rapidly accelerate trains to high speeds without relying on a traditional lift hill.
  • B. roller coaster
    A roller coaster is an amusement ride consisting of a track with steep drops, sharp turns, and inversions that carries passengers in open cars for a thrilling, high-speed experience.
  • C. Bolliger & Mabillard roller coaster
    A Bolliger & Mabillard roller coaster is a high-quality, steel amusement ride engineered by the Swiss firm B&M, known for its smoothness, reliability, and innovative track and train designs across multiple coaster types.
  • D. flying roller coaster
    A flying roller coaster is a type of thrill ride where passengers are secured in a prone, face-down position beneath the track to simulate the sensation of free flight through the air.
  • E. stand-up roller coaster
    A stand-up roller coaster is a type of thrill ride where passengers remain standing in specially designed restraints as the train traverses a track with drops, turns, and inversions.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69f76ef0e8708190987c7254ed8c7abe completed May 3, 2026, 3:51 p.m.
Created at: May 3, 2026, 4:19 p.m.